Search scope:
排序: Display mode:
Experimental monitoring of the strengthening construction of a segmental box girder bridge and field
Ali Fadhil NASER, Zonglin WANG
Frontiers of Structural and Civil Engineering 2012, Volume 6, Issue 3, Pages 308-320 doi: 10.1007/s11709-012-0140-3
Keywords: prestressed concrete box girder monitoring external tendons strain deflection
Distributed monitoring and diagnosis system for hydraulic system of construction machinery
Xiaohu CHEN, Wenfeng WU, Hangong WANG, Yongtao ZHOU,
Frontiers of Mechanical Engineering 2010, Volume 5, Issue 1, Pages 106-110 doi: 10.1007/s11465-009-0089-7
Keywords: construction machinery hydraulic system distributed condition monitoring controller area net (CAN) field
Wang Xuechen,Cheng Lei
Strategic Study of CAE 2004, Volume 6, Issue 3, Pages 64-67
Keywords: dust-storm monitoring and predicting and service system project construction issues of extensive ability
Microseismic monitoring of Well J-253 in complicated construction
Zhao Xinhong,Che Hang,Luo Jiong
Strategic Study of CAE 2012, Volume 14, Issue 4, Pages 12-15
Well J-253 is located in the J-11 fault block of North China oil field. The direction and geometry size of hydraulic fracture are affected by the stress, geological structure and faults, as well as hydraulic sand blasting. The direction of the initial artifical fracture is at NNE, deviating from the direction of the maximum herizontal principal stress. Then it turns to the direction of the maximum horizontal principal stress and normal direction of contour. Moreover, there are significant fissures lined around the well. It has typical significance to study the artifical fracture direction and geometry of Well J-253.
Keywords: microseismic monitoring hydraulic sand blasting fault
Construction risks of Huaying mount tunnel and countermeasures
Haibo YAO, Feng GAO, Shigang YU, Wei DANG
Frontiers of Structural and Civil Engineering 2017, Volume 11, Issue 3, Pages 279-285 doi: 10.1007/s11709-017-0414-x
Keywords: construction gas?outburst geology?prediction automatic?monitoring?system
Deformation monitoring on Three Gorges Project ship lift tower during construction period
Qiu Zhangyun,Luo Chen
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 102-107
Keywords: Three Gorges Project ship lift tower column deformation monitoring total station polar coordinate
Cui Bo,Hu Lianxing,Liu Donghai
Strategic Study of CAE 2011, Volume 13, Issue 12, Pages 91-96
Keywords: high core rock-fill dam filling construction process real-time monitoring transportation to dam rolling
Yang Aiming,Duan Guoxue,Ma Nengwu
Strategic Study of CAE 2011, Volume 13, Issue 7, Pages 117-122
Based on 17 year monitoring data of the Three Gorges Project (TGP), thedeformation, seepage flow and pressure, as well as stress and strain of the main structures in the period of constructionMeanwhile, the operational status and safety features of various structures in different constructionThe monitoring results show that the repeated rise and fall of reservoir water level affect the deformation
Keywords: Three Gorges Project (TGP) structure safety monitoring data analysis
Stress observation of shaft lining wall during construction and initial operation
Wen Dehua
Strategic Study of CAE 2012, Volume 14, Issue 2, Pages 80-84
Keywords: shaft lining monitoring thick topsoil strain additional force
The security monitoring and controlled drainage of Xiamen Subsea Tunnel
Du Chaowei,Wang Mengshu,Tan Zhongsheng
Strategic Study of CAE 2011, Volume 13, Issue 3, Pages 86-91
Keywords: Xiamen Subsea Tunnel controlled drainage construction monitoring water pressure water inflow
Construction geology technology of Karst tunnels on Yichang-Wanzhou Railway
Shen Zhijun
Strategic Study of CAE 2009, Volume 11, Issue 12, Pages 47-52
Taking the construction geology technology practice of karst tunnelson Yichang-Wuanzhou Railway as an example, construction geology, which is a continuation of engineeringgeological exploration in construction stage, can be used to solve the problems which do not exist orharzards, construction geology refers to the comprehensive engineering geology work for ensuring constructionprogress, construction safety, engineering benefit and project quality, such as predicting possible
Keywords: Yichang-Wanzhou Railway comprehensive advanced geology predication hydrological monitoring
Key technologies of real-time construction control for major hydraulic and hydroelectric projects
Ma Hongqi,Zhong Denghua,Zhang Zongliang,Sun Yujun,Liu Donghai
Strategic Study of CAE 2011, Volume 13, Issue 12, Pages 20-27
Keywords: high core rock-fill dam high concrete dam construction quality construction schedule real-time monitoring
Yu Jun,Liu Songyu and Gong Xiaonan
Strategic Study of CAE 2013, Volume 15, Issue 10, Pages 97-102
Keywords: gravel surrounding rock of tunnel numerical analysis construction optimization crown settlement site monitoring
Non-invasive continuous blood pressure monitoring: a review of current applications
Elena Chung, Guo Chen, Brenton Alexander, Maxime Cannesson
Frontiers of Medicine 2013, Volume 7, Issue 1, Pages 91-101 doi: 10.1007/s11684-013-0239-5
Blood pressure monitoring has come a long way from the initial observations made by Reverend HalesThere are none that deny the importance of monitoring perioperative blood pressure; however, the limitedability of the current prevalent technology (oscillometric blood pressure monitoring) to offer continuousInvasive monitoring is able to detect beat-to-beat blood pressure measurement, but the risks inherent, and especially the creation of those offering non-invasive but continuous blood pressure monitoring
Keywords: non-invasive blood pressure monitoring continuous blood pressure monitoring invasive blood pressure monitoring
Continuous dynamic monitoring of a centenary iron bridge for structural modification assessment
Carmelo GENTILE,Antonella SAISI
Frontiers of Structural and Civil Engineering 2015, Volume 9, Issue 1, Pages 26-41 doi: 10.1007/s11709-014-0284-4
Keywords: automated modal identification continuous dynamic monitoring environmental/operational effects iron archbridge structural health monitoring
Title Author Date Type Operation
Experimental monitoring of the strengthening construction of a segmental box girder bridge and field
Ali Fadhil NASER, Zonglin WANG
Journal Article
Distributed monitoring and diagnosis system for hydraulic system of construction machinery
Xiaohu CHEN, Wenfeng WU, Hangong WANG, Yongtao ZHOU,
Journal Article
Construction and Issues Related to the First Phase Project of Dust-storm Monitoring, Predicting and Service
Wang Xuechen,Cheng Lei
Journal Article
Microseismic monitoring of Well J-253 in complicated construction
Zhao Xinhong,Che Hang,Luo Jiong
Journal Article
Construction risks of Huaying mount tunnel and countermeasures
Haibo YAO, Feng GAO, Shigang YU, Wei DANG
Journal Article
Deformation monitoring on Three Gorges Project ship lift tower during construction period
Qiu Zhangyun,Luo Chen
Journal Article
Development and application of the real-time monitoring system for filling construction process of high
Cui Bo,Hu Lianxing,Liu Donghai
Journal Article
The analysis on structure safety monitoring data of Three Gorges Project in construction and operation
Yang Aiming,Duan Guoxue,Ma Nengwu
Journal Article
Stress observation of shaft lining wall during construction and initial operation
Wen Dehua
Journal Article
The security monitoring and controlled drainage of Xiamen Subsea Tunnel
Du Chaowei,Wang Mengshu,Tan Zhongsheng
Journal Article
Construction geology technology of Karst tunnels on Yichang-Wanzhou Railway
Shen Zhijun
Journal Article
Key technologies of real-time construction control for major hydraulic and hydroelectric projects
Ma Hongqi,Zhong Denghua,Zhang Zongliang,Sun Yujun,Liu Donghai
Journal Article
Construction optimization of shallow-buried tunnel in gravel strata based on controlling settlement of
Yu Jun,Liu Songyu and Gong Xiaonan
Journal Article
Non-invasive continuous blood pressure monitoring: a review of current applications
Elena Chung, Guo Chen, Brenton Alexander, Maxime Cannesson
Journal Article